{ "@context": "https://schema.org", "@type": "LocalBusiness", "name": "JB Building Management", "description": "JB Building Management provides building management consulting services for body corporate, specializing in financial analysis and operational efficiency. Our tailored solutions optimize property performance and enhance value.", "address": { "@type": "PostalAddress", "streetAddress": "PO Box 1300 Manly NSW 2095 ", "addressLocality": "Manly", "postalCode": "2095", "addressRegion": "NSW", "addressCountry": "Australia" }, "telephone": "123-456-7890", "email": "info@jbbm.com.au", "website": "https://www.jbbm.com.au", "openingHours": "Mo-Fr 08:00-17:00", "priceRange": "$$$", "geo": { "@type": "GeoCoordinates", "latitude": "33.7969", "longitude": "151.2850" ] }
Is Running Your Strata Building  Just Overwhelming? Running a small to medium size strata building without a dedicated building manager, can be a very demanding and time-consuming task for volunteer strata committee members.   For those without reasonably good knowledge of the building industry and strata, it can be an overwhelming and confusing experience, understanding who does what. LEARN MORE
Is a Lot of Money Spent With Little Scrutiny?
Is Organising It All Like Herding Cats?
Our Services
JB Building Management is based in Manly and is owned and operated by John Bransby. John has over 35 years' experience in the building trade and has a network of reliable, competent, and trustworthy contacts in the building trade, that can handle almost any building issue. He has also done 2 years of commercial building site managing. Qualifications include: Metal Fabrication trade qualifications Diploma of Project Management Member of National Heritage Ironwork Group Experience includes: Expert witness work in Court hearings, with expertise in heritage architectural metalwork Heritage metalwork restoration Blacksmithing Architectural CAD drafting and designing Working with engineers, architects, licensed builders, fire safety and other consultants Commercial building site management Buildings with major fire safety, remedial work, drainage, damp and structural problems Dealing with unauthorized renovations within strata buildings Facilitating lot owners' renovation applications Liaising on behalf of Owners with strata managers Areas Covered: Lower Northern Beaches of Sydney Manly to Dee Why Fairlight Seaforth Balgowlah Mosman Other areas considered.
Does this scenario sound familiar…..
About Us
Case Studies
Copyright © 2023 JB Building Management
FAQs
Contact
Address:
Phone:
Email:
PO Box 1300 Manly NSW 2095
0481 81 5530
john@jbbm.com.au

SAVING MONEY WITH HIGH QUALITY QUOTE REQUESTS  So often in strata buildings, owners want some work done and request the strata manager obtains 3 quotes.  What happens is 3 contractors quote on the job but the quotes are vastly different and contain very little meaningful information. The strata committee is ‘flying blind’ not really understanding what they will receive or if the price is reasonable.  With years of experience in the building industry, JB Building Management can work with the strata committee and write up a well specified quote request containing an exact scope of work and very specific details (specifications).  This ensures the right work is being quoted on, done to the required standard / specification, and it ensures all tenderers are quoting on the same basis.
SAVING MONEY CHECKING INVOICES & WORK COMPLETED  A common occurrence in strata buildings is having work quoted, carried out and then billed without knowing if the job was done well or as quoted.  With years of experience in the building industry, JB Building Management can check the work has been completed as quoted and has been done well, before a contractor leaves site and it can be hard to verify.   Having JB Building Management check on the work at completion provides peace of mind for the strata committee, when a committee member cannot perform this task.  We can take photos or send through a confirmation to the strata committee that the contractor’s invoice is correct and should be approved. Once contractors know someone knowledgable is checking, the risk of poor quality work or unfinished work is very low.
Q1.What does this project co-ordination service cost?  We provide a fee proposal for each building to cover the services needed. Typical hourly rates are  $190/hr plus GST.   Q2. How do you bill your services? We regularly provide itemised time billing for everything we do and only charge for actual time spent doing the work for your building.There are no minimum fees per task or minimum charges for a site visit.  Q3. The service sounds like what a full time building manager would do on a large building. Is that correct? Yes, that’s the best way to think of us. Having someone on call, to do all the leg work associated with organising quotes, obtaining fee proposals and just getting work done around the building.   Our service is especially designed for buildings where the strata committee does not have members with the time, inclination or skills to co-ordinate the many small projects needing to be done on any building.  Q4. What other tasks can you do? Some buildings require a regular inspection just to make sure there is no unreported vandalism or maintenance. We can do that and report back to the strata committee, so they can take action.  We could also check on contractors’ work, to make sure what was quoted has been carried out correctly and as agreed.  Q5. Who makes requests for work to be done? An agreement would be reached with each building. We only act on instructions from the strata committee or if they authorise their strata manager. Unless authorised,it is not our job to deal with requests coming from anyone else, such as tenants or non-committee owners. Everything must be authorised in writing, in our agreement.
Project co-ordination services for building owners including:  •	Briefing contractors beforehand or at site meetings and arranging quotes  •	Creating written briefs or quote requests for trade contractors or consultants on behalf of owners.  •	Provide hand drawings and CAD drawings for projects.  •	Meeting on or off site with all trades, including air cond, HVAC, electrical, plumbing, maintenance, painting, glazing, remedial builders, lifts, waterproofing, tiling, cleaning, security systems, telecom installations, locksmiths, landscapers, fire safety, roofing, balustrades, gates, fencing, pool fencing and pool maintenance.  •	Meeting with engineers, architects, builders, consultants on or off site, on behalf of owners. Reporting to strata committee members on project status.
•	An overwhelming backlog of building repair work that takes a huge amount of time to organise.  •	Endless meetings with trade contractors and consultants AND trying to deal with overloaded strata managers, who simply often don't have the time to take an in-depth look at what's going on or know the building well enough.  JB Building Management provides that missing link that buildings without an onsite building manager need. Think of us as your on-call building manager and project co-ordinator.  We are the link between the strata committee, strata manager and all the contractors and consultants needed to maintain your building.   We do all the heavy lifting for the strata committee and make the building run like a well-oiled machine.
Overwhelmed with Managing Your Strata Building? LEARN MORE Are you wasting money on strata management because of no scrutiny?
Is a Lot of Money Spent Without Scrutiny?
Is Organising It All Like Herding Cats?
Projeect co-ordination for building owners can be a real headache.
Does this scenario sound familiar…..
•	An overwhelming backlog of building repair work that takes a huge amount of time to organise.  •	Endless meetings with trade contractors and consultants AND trying to deal with overloaded strata managers, who simply often don't have the time to take an in-depth look at what's going on or know the building well enough.  JB Building Management provides that missing link that buildings without an onsite building manager need. Think of us as your on-call building manager and project co-ordinator.  We are the link between the strata committee, strata manager and all the contractors and consultants needed to maintain your building.   We do all the heavy lifting for the strata committee and make the building run like a well-oiled machine.
Services
Project co-ordination for building owners including:  •	Briefing contractors before or at site meeting.  •	Creating written briefs for trade contractors or consultants on behalf of owners.  •	Provide hand drawings and CAD drawings for projects.  •	Meeting on or off site with all trades, including air cond, HVAC, electrical, plumbing, maintenance, painting, glazing, remedial builders, lifts, waterproofing, tiling, cleaning, security systems, telecom installations, locksmiths, landscapers, fire safety, roofing, balustrades, gates, fencing, pool fencing and pool maintenance.  •	Meeting with engineers, architects, builders, consultants on or off site, on behalf of owners.
About Us
FAQs
Q1.What does this project co-ordination service cost?  We provide a fee proposal for each building to cover the services needed. Typical hourly rates are  $190/hr plus GST.   Q2. How do you bill your services? We regularly provide itemised time billing for everything we do and only charge for actual time spent doing the work for your building.There are no minimum fees per task or minimum charges for a site visit.  Q3. The service sounds like what a full time building manager would do on a large building. Is that correct? Yes, that’s the best way to think of us. Having someone on call, to do all the leg work associated with organising quotes, obtaining fee proposals and just getting work done around the building.   Our service is especially designed for buildings where the strata committee does not have members with the time, inclination or skills to co-ordinate the many small projects needing to be done on any building.  Q4. What other tasks can you do? Some buildings require a regular inspection just to make sure there is no unreported vandalism or maintenance. We can do that and report back to the strata committee, so they can take action.  We could also check on contractors’ work, to make sure what was quoted has been carried out correctly and as agreed.  Q5. Who makes requests for work to be done? An agreement would be reached with each building. We only act on instructions from the strata committee or if they authorise, their strata manager. Unless authorised, it is not our job to deal with requests coming from anyone else, such as tenants or non-committee owners. Everything must be authorised in writing, in our agreement.
Case Studies
SAVING MONEY WITH HIGH QUALITY QUOTE REQUESTS  So often in strata buildings, owners want some work done and request the strata manager obtains 3 quotes.  What happens is 3 contractors quote on the job but the quotes are vastly different and contain very little meaningful information. The strata committee is ‘flying blind’ not really understanding what they will receive or if the price is reasonable.  With years of experience in the building industry, JB Building Management can work with the strata committee and write up a well specified quote request containing an exact scope of work and very specific details (specifications).  This ensures the right work is being quoted on, done to the required standard / specification, and it ensures all tenderers are quoting on the same basis.
Address: Phone: Email: PO Box 1300 Manly  NSW  2095  0481 81 5530 john@jbbm.com.au

Is Running Your Strata Building  Just Overwhelming? Running a small to medium size strata building without a dedicated building manager, can be a very demanding and time-consuming task for volunteer strata committee members.   For those without reasonably good knowledge of the building industry and strata, it can be an overwhelming and confusing experience, understanding who does what.
Contact
SAVING MONEY CHECKING INVOICES & WORK COMPLETED  A common occurrence in strata buildings is having work quoted, carried out and then billed without knowing if the job was done well or as quoted.  With years of experience in the building industry, JB Building Management can check the work has been completed as quoted and has been done well, before a contractor leaves site and it can be hard to verify.   Having JB Building Management check on the work at completion provides peace of mind for the strata committee, when a committee member cannot perform this task.  We can take photos or send through a confirmation to the strata committee that the contractor’s invoice is correct and should be approved. Once contractors know someone knowledgable is checking, the risk of poor quality work or unfinished work is very low.
JB Building Management is based in Manly and is owned and operated by John Bransby.    John has over 35 years' experience in the building trade and has a network of reliable, competent, and trustworthy contacts in the building trade, that can handle almost any building issue.   He has also done 2 years of commercial building site managing.  Qualifications include:  •	Metal Fabrication trade qualifications •	Diploma of Project Management •	Member of National Heritage Ironwork Group  Experience includes:  •	Expert witness work in Court hearings, with expertise in heritage architectural metalwork •	Heritage metalwork restoration •	Blacksmithing •	Architectural CAD drafting and designing •	Working with engineers, architects, licensed builders, fire safety and other consultants •	Commercial building site management •	Buildings with major fire safety, remedial work, drainage, damp and structural problems •	Dealing with unauthorized renovations within strata buildings •	Facilitating lot owners' renovation applications •	Liaising on behalf of Owners with strata managers  Areas Covered:  Lower Northern Beaches of Sydney  •	Manly to Dee Why •	Fairlight •	Seaforth •	Balgowlah •	Mosman •	Other areas considered.